Sewer Fees

Sewer Installation Fee


The City of Sunnyside does not install sewer services. Work must be done by a licensed contractor. Sewer connection equity fees are charged according to the following schedule for connecting to the city’s sanitary sewer.

Equity Fee Schedule


Residential


  • Single-family residential dwelling unit: $400
  • Duplex and multi-dwelling unit, apartment, mobile home park: $450 basic equity fee plus $.08 per foot of living space.

Commercial

  • $450 basic equity fee plus $.05 per square foot of building floor space
  • Increases in building floor space shall result in an additional charge of $.05 per square foot for the additional building floor space

Industrial

  • $450 basic equity fee plus $.10 per square foot of the building or structure to which the sewer connection is being made
  • Increases in building floor space shall result in an additional charge of $.10 per square foot for the additional building floor space